Example
Assume estimated fair rate
- flow 1, P = min(1, 4/8) = 0.5
- expected rate of forwarded traffic 8*P = 4
- flow 2, P = min(1, 4/6) = 0.67
- expected rate of forwarded traffic 6*P = 4
- flow 3, P = min(1, 4/2) = 1
- expected rate of forwarded traffic 2
Question: How is the fair rate estimated ?