| home | projects | hobbies | resume | links | contact |
![]() |
![]() |
|||||
| Palm Pilot III redesign (08/99, 3 months) | ||||||
| Challenge | Evaluate the usability of Palm Pilot III, and redesign it. Develop design recommendations for the Palm IV. | |||||
| Process | Conducted the
empirical and analytical usability evaluation techniques such as contextual inquiry, heuristic evaluation, cognitive
walkthrough, and think aloud user testing to identify the
problems that Palm Pilot III has, and came up with two
redesign ideas.
|
|||||
| Solution
|
Came up with two design solutions: 1. a new style of interaction called the PalmProject which allowed the user to conceptualize these details as different aspects of a single project. 2. PalmLink, which moves buried functionality to higher levels, and clearer labeling of functions. Designed the experiment to compare which is better. Report has been sent to Palm Computing as a reference for the future development. Report:
PalmPilot III Redesign
|
|||||
|
|
||
| In-flight entertainment system . Stockphone . Allbank web . Chinese Gardens . Architecture dept web . Real estate buying system . eToys web design .Car Music System . Visage redesign . Palm Pilot III redesign | ||