THE FIFTH FRAMEWORK PROGRAMME
The Fifth Framework Programme focuses on Community
activities in the field of research, technological development
and demonstration (RTD) for the period 1998 to 2002
CONTRACT PREPARATION FORMS (CPF)
for
Financial support from the EC
for shared-cost RTD actions:
research and technological development projects,
demonstration projects,
and
combined projects *
Part 3:
Contractor's Forms (A8.1 - A8.4 and Annex 2: Financial data)
These forms must be used together with Part 1, the notes to the forms.

This document can be downloaded from URL: http://www.cordis.lu/ fp5/cpf.htm
Final Version, 12 August, 1999
Ref. No. cpf_rtdp_en_199901C
Contractor's Section
Contract Preparation forms
(A8.1-A8.4)
|
Shared Cost RTD CPF Form – Form A8.1 1/2 |
|||||||||||||||||||
|
|
European Commission Research Directorates General |
||||||||||||||||||
|
EN |
L |
1 |
FP5RTD |
||||||||||||||||
|
for commission use only
|
|||||||||||||||||||
|
Project Acronym 2 |
Proposal No 3 |
|
A8.1 |
Participant Profile/Information (1 form per participant) (part 1/2)50 |
|
Legal information on the participating organisation |
||||||||||||||||||||
|
Participant Role 22 |
Participant No 23 |
Assistant to Contractor No 24 |
||||||||||||||||||
|
Registration No with the European Commission's Research Programmes 51 |
||||||||||||||||||||
|
Organisation Legal Name 52 |
|
|||||||||||||||||||
|
Short Name 53 |
||||||||||||||||||||
|
Legal Registration No 54 |
VAT No 55 |
|||||||||||||||||||
|
Activity Type 56 |
Legal Status 57 |
If 'PRC', Specify 58 |
||||||||||||||||||
|
Business Area 59 (NACE) |
User/Supplier 60 (U / S) |
Cost Basis 61 (FC / FF / AC) |
||||||||||||||||||
|
Legal Address of the organisation 62 |
||||||||||||||||||||
|
PO Box 11 |
||||||||||||||||||||
|
Street Name and Number |
|
|||||||||||||||||||
|
Post Code 12 |
Cedex 13 |
|||||||||||||||||||
|
Town/City |
||||||||||||||||||||
|
Country Code 14 |
Country Name 14 |
|||||||||||||||||||
|
Organisation details 63 |
||||||||||||||||||||
|
Year 64 |
||||||||||||||||||||
|
Annual turnover65 |
Annual Balance Sheet Total66 |
Total R&D Expenditure67 |
||||||||||||||||||
|
Number of employees 68 |
Number of R&D Personnel 69 |
|||||||||||||||||||
|
Number of researchers and engineers 70 |
Female researchers and engineers 71 |
|||||||||||||||||||
|
Is Your Organisation independent 72 |
Y |
N |
||||||||||||||||||
|
If No, please indicate legal name(s) of owner(s) who own |
||||||||||||||||||||
|
Is Your Organisation affiliated to any other participant(s) in the project 74? |
Y |
N |
||||||||||||||||||
|
If Yes, please indicate Participant No, Short Name(s) and character of affiliations(s) |
||||||||||||||||||||
|
Address of the main Institute/ Department/ Laboratory carrying out the work 76 |
||||||||||||||||||||
|
Institute/Department/ Laboratory Name 10 |
|
|||||||||||||||||||
|
PO Box 11 |
||||||||||||||||||||
|
Street Name and Number |
|
|||||||||||||||||||
|
Post Code 12 |
Cedex 13 |
|||||||||||||||||||
|
Town/City |
||||||||||||||||||||
|
Country Code 14 |
Country Name 14 |
|||||||||||||||||||
|
Shared Cost RTD CPF Form – Form A8.1 2/2 |
|||||||||||||||||||
|
|
European Commission Research Directorates General |
||||||||||||||||||
|
EN |
M |
1 |
FP5RTD |
||||||||||||||||
|
for commission use only
|
|||||||||||||||||||
|
Project Acronym 2 |
Proposal No 3 |
|
A8.1 |
Participant Profile/Information (1 form per participant) (part 2/2)50 |
|
Participant Role 22 |
Participant No 23 |
Assistant to Contractor No 24 |
|
Authorised administrative official for the purpose of contract signature 77 |
|||||||||
|
Title (Dr, Prof., ...) |
Gender 8 |
F |
M |
||||||
|
Function 78 |
|||||||||
|
Family Name |
|||||||||
|
First Name |
|||||||||
|
Telephone No 15 |
Fax No 15 |
||||||||
|
|
|||||||||
|
Second Authorised administrative official for the purpose of contract signature 79 |
|||||||||
|
Title (Dr, Prof., ...) |
Gender 8 |
F |
M |
||||||
|
Function 78 |
|||||||||
|
Family Name |
|||||||||
|
First Name |
|||||||||
|
Telephone No 15 |
Fax No 15 |
||||||||
|
|
|||||||||
|
Scientific Person in charge of the project 80 |
|||||||||
|
Title (Dr, Prof., ...) |
Gender 8 |
F |
M |
||||||
|
Function 78 |
|||||||||
|
Family Name |
|||||||||
|
First Name |
|||||||||
|
Telephone No 15 |
Fax No 15 |
||||||||
|
|
|||||||||
|
Authorised contact person 81 |
|||||||||
|
Title (Dr, Prof., ...) |
Gender 8 |
F |
M |
||||||
|
Function 78 |
|||||||||
|
Family Name |
|||||||||
|
First Name |
|||||||||
|
Telephone No 15 |
Fax No 15 |
||||||||
|
|
|||||||||
|
I certify that the information set out in forms A8.1 to A8.4 (Annex 2) is accurate and correct and that the estimated costs conform with the European Commission's allowable costs for RTD support and our normal cost accounting principles and reflect the costs expected to be incurred in carrying out the approved Annex 1 to the contract description of work. I also confirm that our organisation is committed to participate to the above mentioned research project. |
|||||||||
|
Date (DD/MM/YYYY) |
|||||||||
|
Signature of authorised contact person |
|||||||||
|
Shared Cost RTD CPF Form – Form A8.2 |
||||||||||||||||||||||
|
|
European Commission Research Directorates General |
|||||||||||||||||||||
|
EN |
N |
1 |
FP5RTD |
|||||||||||||||||||
|
for commission use only
|
||||||||||||||||||||||
|
Project Acronym 2 |
Proposal No 3 |
|
A8.2 |
Participant Profile/Information (1 form per participant) Personnel costs/overheads 50 |
|
Participant Role 22 |
Participant No 23 |
Assistant to Contractor No 24 |
|||||||||
|
Personnel costs and overheads82 |
|||||||||||
|
Categories of staff to work on the project 83: |
|||||||||||
|
1: |
|||||||||||
|
2: |
|||||||||||
|
3: |
|||||||||||
|
4: |
|||||||||||
|
Personnel Costs84 Year 1 |
Overhead Costs85 Year 1 |
||||||||||
|
Staff Cat.: |
Hours on Project |
Hourly Rate (EURO) |
Personnel costs (EURO) |
Hourly overhead rate (EURO) |
Overhead costs (EURO) |
||||||
|
1. |
|||||||||||
|
2. |
|||||||||||
|
3. |
|||||||||||
|
4. |
|||||||||||
|
Total Personnel costs year 1: |
Total overhead y 1: |
||||||||||
|
Personnel Costs Year 2 |
Overhead Costs Year 2 |
||||||||||
|
Staff Cat.: |
Hours on Project |
Hourly Rate (EURO) |
Personnel costs (EURO) |
Hourly overhead rate (EURO) |
Overhead costs (EURO) |
||||||
|
1. |
|||||||||||
|
2. |
|||||||||||
|
3. |
|||||||||||
|
4. |
|||||||||||
|
Total Personnel costs year 2: |
Total overhead y 2: |
||||||||||
|
Personnel Costs Year 3 |
Overhead Costs Year 3 |
||||||||||
|
Staff Cat.: |
Hours on Project |
Hourly Rate (EURO) |
Personnel costs (EURO) |
Hourly overhead rate (EURO) |
Overhead costs (EURO) |
||||||
|
1. |
|||||||||||
|
2. |
|||||||||||
|
3. |
|||||||||||
|
4. |
|||||||||||
|
Total Personnel costs year 3: |
Total overhead y 3: |
||||||||||
|
Total Personnel costs: |
Total Overhead |
||||||||||
|
Hourly Rates are based on: Actual Salaries: Average Salaries86: |
|||||||||||
|
Base year for the rates are: |
Average increases per year in percent: % |
||||||||||
|
Number of productive hours per year87: |
Overhead percentage: % |
||||||||||
|
For all Participants with Subcontractors (Person months): |
||||
|
Total number of person months worked on the project by all subcontractors for this participant: |
Year 1 |
Year 2 |
Year 3 |
Total |
|
Total number of all subcontractor's person months: |
||||
|
For additional cost participants 88 (Hours) |
||||||
|
Categories of Permanent staff to work on the project: |
Year 1 |
Year 2 |
Year 3 |
Total |
||
|
1: Academics |
||||||
|
2: Technicians |
||||||
|
3: Other (scientific/technical) |
||||||
|
Total hours |
||||||
|
Shared Cost RTD CPF Form – Form A8.3 1/2 |
||||||||||||||||||||||
|
|
European Commission Research Directorates General |
|||||||||||||||||||||
|
EN |
O |
1 |
FP5RTD |
|||||||||||||||||||
|
for commission use only
|
||||||||||||||||||||||
|
Project Acronym 2 |
Proposal No 3 |
|
A8.3 |
Participant Profile/Information (1 form per participant) Other costs (part 1/2)50 |
|
Participant Role 22 |
Participant No 23 |
Assistant to Contractor No 24 |
|||||||
|
Durable Equipment costs (EURO) 89 |
|||||||||
|
Description 90 |
Month of purchase 91 |
Cost of purchase (EURO) 92 |
Period of use (months) 93 |
Depreciation period (months) 94 |
% usage on the project 95 |
Amount charged to project (EURO) 96 |
|||
|
Total |
|||||||||
|
Consumables costs (EURO) 97 |
|||||
|
Description: |
Year 1 |
Year 2 |
Year 3 |
Total |
|
|
1: |
|||||
|
2: |
|||||
|
3: |
|||||
|
4: |
|||||
|
Total |
|||||
|
Travel / subsistence costs (EURO) 98 |
|||||
|
Description: |
Year 1 |
Year 2 |
Year 3 |
Total |
|
|
Total |
|||||
|
Computing costs (EURO) 99 |
|||||
|
Description: |
Year 1 |
Year 2 |
Year 3 |
Total |
|
|
1: |
|||||
|
2: |
|||||
|
3: |
|||||
|
4: |
|||||
|
Total |
|||||
|
Shared Cost RTD CPF Form – Form A8.3 2/2 |
||||||||||||||||||||||
|
|
European Commission Research Directorates General |
|||||||||||||||||||||
|
EN |
P |
1 |
FP5RTD |
|||||||||||||||||||
|
for commission use only
|
||||||||||||||||||||||
|
Project Acronym 2 |
Proposal No 3 |
|
A8.3 |
Participant Profile/Information (1 form per participant) Other costs (part 2/2)50 |
|
Participant Role 22 |
Participant No 23 |
Assistant to Contractor No 24 |
|
Subcontracting costs (EURO) 100 |
||||||
|
Subcontractors (names) |
Country Code |
Work service |
Costs Year 1 |
Costs Year 2 |
Costs Year 3 |
Total |
|
1: |
||||||
|
2: |
||||||
|
3: |
||||||
|
4: |
||||||
|
Total |
||||||
|
Other specific project costs (EURO) 101 |
|||||
|
Description: |
Year 1 |
Year 2 |
Year 3 |
Total |
|
|
1: |
|||||
|
2: |
|||||
|
3: |
|||||
|
4: |
|||||
|
Total |
|||||
|
Protection of knowledge (EURO) 102 |
|||||
|
Description: |
Year 1 |
Year 2 |
Year 3 |
Total |
|
|
1: |
|||||
|
2: |
|||||
|
3: |
|||||
|
4: |
|||||
|
Total |
|||||
|
Year 1 |
Year 2 |
Year 3 |
Total |
|
|
Total allowable costs |
||||
|
EC contribution in percentage 103 |
||||
|
Total EC contribution |
|
Conversion rate used |
|
|
National Currency104: |
Conversion Rate to EURO105: |
|
|
|
Shared Cost RTD CPF Form – Form A8.4 |
|||||||||||||||||||
|
|
European Commission Research Directorates General |
||||||||||||||||||
|
EN |
Q |
1 |
FP5RTD |
||||||||||||||||
|
for commission use only
|
|||||||||||||||||||
|
Project Acronym 2 |
Proposal No 3 |
|
A8.4 |
Participant Profile/Information (1 form per participant) 50 |
|
Participant Role 22 |
Participant No 23 |
Assistant to Contractor No 24 |
|
Financial information on the contractor's own contribution and other public sector contributions to the contract 106 |
|
Other public sector contributions towards the participation under the contract 107: |
|
Participant’s own contribution towards the participation under the contract108: |
|
Human resources information |
|
Total person hours agreed for the proposed participation to the contract: |
|
Of which researchers and engineers (RSE) person hours (total number of RSE hours on the contract): |
|
Of which number of female RSE hours (total number of female RSE hours on the contract): |
|
Link of subcontractor(s) |
||
|
Are any of the subcontractors linked to a contractor or associated contractor? |
O NO O YES |
Nature of link: |
|
Financial and accounting rules used by the Participant 109 |
|
|
Has information on your organisation's cost accounting principles and systems (in particular for calculating the personnel costs and allocating overheads) already been supplied to the Research Programmes of the Commission? |
o NO o YES ______________________Specify the most recent Commission contract number o X = Annex on Financial and Accounting Rules attachedo X = Annex on Overhead calculation attached |
|
Documents (X = Annex Attached) |
||
o Legal documents establishing organisation 110o Annual reports and balance sheets111o Organisation structure112
If applicable and not attached, please specify most recent Research Programme contract number where supplied. |
||
|
|
||
Annex 2
Financial data
|
Shared Cost RTD CPF Form – Annex 2 Part 1/2 |
|||||||||||||||||||
|
|
European Commission Research Directorates General |
||||||||||||||||||
|
EN |
U |
1 |
FP5RTD |
||||||||||||||||
|
for commission use only
|
|||||||||||||||||||
|
Project Acronym 2 |
Proposal No 3 |
|
Annex 2 |
Financial Data (1 form per participant) 120 |
|
Participant Role 22 |
Participant No 23 |
Assistant to Contractor No 24 |
|
Historical data |
Budgeted data (without EC contribution) |
||||||
|
Company |
t-2 |
t-1 |
t0 |
t+1 |
|||
|
BALANCE SHEET |
|||||||
|
ASSETS |
|||||||
|
1. Subscribed capital unpaid |
|||||||
|
2. Fixed assets |
|||||||
|
2.1. Intangible fixed assets |
|||||||
|
2.2. Tangible fixed assets |
|||||||
|
2.3. Financial assets |
|||||||
|
3. Current assets |
|||||||
|
3.1. Stocks |
|||||||
|
3.2.1. Debtors due after one year |
|||||||
|
3.2.2. Debtors due within one year |
|||||||
|
3.3. Cash at bank and in hand |
|||||||
|
3.4. Other current assets |
|||||||
|
Total assets |
|||||||
|
LIABILITIES |
|||||||
|
4. Capital and reserves |
|||||||
|
4.1. Subscribed capital |
|||||||
|
4.2. Reserves |
|||||||
|
4.3. Profit and loss brought forward |
|||||||
|
5. Creditors |
|||||||
|
5.1.1 Long term non-bank debt |
|||||||
|
5.1.2 Long term bank debt |
|||||||
|
5.2.1. Short term non-bank debt |
|||||||
|
5.2.2. Short term bank debt |
|||||||
|
Total liabilities |
|||||||
|
|
|
Shared Cost RTD CPF Form – Annex 2 Part 2/2 |
|||||||||||||||||||
|
|
European Commission Research Directorates General |
||||||||||||||||||
|
EN |
V |
1 |
FP5RTD |
||||||||||||||||
|
for commission use only
|
|||||||||||||||||||
|
Project Acronym 2 |
Proposal No 3 |
|
Annex 2 |
Financial Data (1 form per participant) 120 |
|
Participant Role 22 |
Participant No 23 |
Assistant to Contractor No 24 |
|
Historical data |
Budgeted data (without EC contribution) |
||||||
|
Company |
t-2 |
t-1 |
t0 |
t+1 |
|||
|
BALANCE SHEET |
|||||||
|
PROFIT AND LOSS ACCOUNT |
|||||||||
|
6. Turnover |
|||||||||
|
7. Variation in stocks |
|||||||||
|
8. Other operating income |
|||||||||
|
9. Costs of material and consumables |
|||||||||
|
10. Added value |
|||||||||
|
11. Staff costs |
|||||||||
|
12. Gross operating profit |
|||||||||
|
13. Depreciation and value adjustments on non financial assets |
|||||||||
|
14. Net operating profit |
|||||||||
|
15. Financial income and value adjustments on financial assets |
|||||||||
|
16. Interest paid |
|||||||||
|
17. Similar charges |
|||||||||
|
18. Profit or loss on ordinary activities |
|||||||||
|
19. Extraordinary income and charges |
|||||||||
|
20. Taxes on profits |
|||||||||
|
21. Profit or loss for the financial year |
|||||||||
|
22. Profit or loss for the financial year + Depreciation |
|||||||||
|
|
|||||||||
|
APPLICATION FORM |
ASSETS "4th ACCOUNTING DIRECTIVE (Article 9)" |
||
|
1. Subscribed capital unpaid |
A. Subscribed capital unpaid |
A. Subscribed capital unpaid (including unpaid capital) |
|
|
2. Fixed assets |
C. Fixed Assets |
||
|
2.1. Intangible fixed assets |
B. Formation expenses as defined by national law C. I. Intangible fixed assets |
B. Formation expenses as defined by national law C.I.1. Cost of research and development C.I.2.Concessions, patents, licences, trade marks and similar rights and assets, if they were: (a) acquired for valuable consideration and need not be shown under C |
|
|
2.2. Tangible fixed assets |
C.II.Tangible fixed assets |
C.II.1. Land and buildings C.II.2. Plant and machinery C.II.3. Other fixtures and fittings, tools and equipment C.II.4. Payment on account and tangible assets in course of construction |
|
|
2.3. Financial assets |
C.III.Financial assets |
C.III.1.Shares in affiliated undertakings C.III.2. Loans to affiliated undertakings C.III.3. Participating interests C.III.4.Loans to undertakings with which the compagy is linked by virtue of participating interest C.III.5.Investments held as fixed assets |
|
|
3. Current assets |
D. Currents assets |
||
|
3.1. Stocks |
D.I.Stocks |
D.I.1. Raw materials and consumables D.I.2. Work in progress D.I.3. Finished products and goods for resale D.I.4 Payment on account |
|
|
3.2.1. Debtors, due and payable after more than one year |
D.II. Debtors, due and payable after more than one year |
D.II.1. Trade debtors D.II.2. Amounts owed by affiliated undertakings D.II.3. Amounts owed by undertakings with which the compagny is linked by virtue of participating interest D.II.4. Others debtors D.II.6. Prepayments and accrued income |
|
|
3.2.2. Debtors, due and payable within a year |
D.II. Debtors due and payable within a year |
D.II.1. Trade debtors D.II.2. Amounts owed by affiliated undertakings D.II.3. Amounts owed by undertakings with which the company is linked by virtue of participating interest D.II.4. Others debtors D.II.6. Prepayments and accrued income |
|
|
3.3. Cash at bank and in hand |
D.IV. Cash at bank and in hand |
D.IV. Cash at bank and in hand |
|
|
3.4. Other current assets |
D.III Investments |
D.III.1. Shares in affiliated undertakings D.III.2.Own shares (with an indication of their nominal value or, in the absence of a nominal value, their accounting par value) D.III.3. Other investments |
|
|
Total assets |
Total assets |
||
|
APPLICATION FORM |
LIABILITIES / 4th ACCOUNTING DIRECTIVE (Article 9) |
||
|
4. Capital and reserves |
A. Capital and reserves |
||
|
4.1 Subscribed capital |
A.I. Subscribed capital A.II. Share premium account |
A.I. Subscribed capital A.II. Share premium account |
|
|
4.2. Reserves |
A.III. Revaluation reserve A.IV. Reserves |
A.III. Revaluation reserve A.IV.1. Legal reserve, in so far as national law requires such a reserve A.IV.2. Reserve for own shares A.IV.3. Reserves provided for by the articles of association A.IV.4. Other reserves |
|
|
4.3. Profit and loss brought forward |
A.V Profit and loss brought forward from the previous years A.VI. Profit or loss for the financial year |
A.V Profit and loss brought forward from the previous years A.VI. Profit or loss for the financial year |
|
|
5. Creditors |
C. Creditors |
||
|
5.1.1. Long term non-bank debt |
B. Provisions for liabilities and charges ( > one year) C. Creditors ( > one year) |
B.1. Provisions for pensions and similar obligations B.2. Provisions for taxation B.3. Other provisions C.1. Debenture loans C.3. Payments received on accounts of orders in so far as they are not shown separately as deductions from stocksTrade creditor |
|
|
5.1.2. Long term bank debt |
C. Creditors "credit institutions" ( > one year) |
C.2 Amounts owed to credit institutions C.5. Bills of exchange payable |
|
|
5.2.1. Short term non-bank debt |
B. Provisions for liabilities and charges ( < or = one year) C. Creditors ( < or = one year) |
B.1. Provisions for pensions and similar obligations. B.2. Provisions for taxation. B.3. Other provisions. C.1. Debenture loans C.3. Payments received on accounts of orders in so far as they are not shown separately as deductions from stocksTrade credit |
|
|
5.2.2. Short term bank debt |
C. Creditors "credit institutions" ( < or = one year) |
C.2 Amounts owed to credit institutions C.5. Bills of exchange payable |
|
|
Total liabilities |
Total Liabilities |
||
|
APPLICATION FORM |
PROFIT AND LOSS ACCOUNT / 4th ACCOUNTING DIRECTIVE (Article 23) |
||
|
6.Turnover |
1. Net turnover |
1. Net turnover |
|
|
7. Variation in stocks |
2. Variation in stock of finished goods and in work in progress |
2. Variation in stock of finished goods and in work in progress |
|
|
8. Other operating income |
3. Work performed by the undertaking for its own purposes and capitalized. 4. Other operating income |
3. Work performed by the undertaking for its own purposes and capitalized. 4. Other operating income |
|
|
9. Costs of material and consumables |
5. (a) Raw materials and consumables 5. (b) Other external charges 8. Other operating charges |
5. (a) Raw materials and consumables 5. (b) Other external charges 8. Other operating charges |
|
|
10. Added value |
Added value =1+2+4-(5a+5b) |
||
|
11. Staff costs |
6. Staff costs |
6.(a) Wages and salaries 6.(b) social security costs |
|
|
12. Gross operating profit |
Added value - staff costs = [1+2+4-(5a+5b)] - 6 |
||
|
13. Depreciation and value adjustments on non financial assets |
7. Depreciation and value adjustments on non financial assets |
7.(a) Value adjustments in respect of formation expenses and of tangible and intangible fixed assets 7. (b) Value adjustments in respect of current assets, to the extent that they exceed the amount of value adjustments which are normal in the undertaking |
|
|
14. Net operating profit |
(Added value - staff costs) - Depreciation and value adjustments on non-financial assets = [1+2+4-(5a+5b)] - 7 |
||
|
15. Financial income and value adjustments on financial assets |
Financial income and value adjustments on financial assets |
9. Income from participating interests 10. Income from other investment and loans forming part of the fixed assets 11. Other interest receivable and similar income 12. Value adjustments in respect of financial assets and of investments held as current ass |
|
|
16. Interest paid |
Interest paid |
13. Interest and similar charge |
|
|
17. Similar Charges |
Similar Charges |
||
|
18. Profit or loss on ordinary activities |
Profit or loss on ordinary activities =[ [1+2+4-(5a+5b)] - 7] + [(9+10+11)-(12+13)] |
||
|
19. Extraordinary income and charges |
Extraordinary income and charges |
16. Extraordinary income 17. Extraordinary charges |
|
|
20. Taxes |
Tax on profit or loss on ordinary activities Tax on extraordinary profit or loss |
14. Tax on profit or loss on ordinary activities 19. Tax on extraordinary profit or loss 20. Other taxes not shown under the above items |
|
|
21. Profit or loss for the financial year |
Profit or loss for the financial year |
21. Profit or loss for the financial year
|
|
|
22. Profit or loss for the financial year + Depreciation |
Profit or loss for the financial year + Depreciation
|
||
Financial Data. Form (Annex 2)
All private organisations and individuals participating under the FC and FF cost models, except for public organisations and universities must fill in this form. It provides the basis for the calculation by the Commission services to verify that the organisation has the necessary human and financial resources to carry out the work. The explanations to the form are provided immediately after the form. The t stands for time, so that t0 is the latest year for which account is available, t-1 and t-2 the two years preceding and t+1 is the current year (estimated or budget amounts).