Solutions to Assign 3 problems 1-5 Out of 45 points 1: (3pt) Min: 1000 Tc + 2000 Cc + 3000 Ac + 1500 Tne + 3000 Cne + 3700 Ane ST: Tc + Tne = 1000000 Cc + Cne = 1000000 Ac + Ane = 1000000 Tc + Cc + Ac = 800000 Tne + Cne + Ane = 2200000 All vars >= 0 (With appropriate assignment of variables). 2: (6pt) x3 enters and x5 leaves giving a cost of -2 3: (6pt) A) Q (0,3,0) B) S = 3/7 4: (6pt) A = [2 1 1] b = 4 c = [1 1 0] x_0 = [.1 .1 3.7] w = .00218 z' = [.0996 .0998 -.008] z = [.00996 .00998 -.03] x_1 = [1.283 1.286 0.148] w = .599 z' = [-.254 .516 -.088] z = [-.325 .664 -.013] x_2 = [.052 3.8 .098] 5) (6pt) For each constraint B_i x <= d_i in T Check if Ax <= b, B_i x >= d_i has a feasible solution. If any do, then S is not properly contained in T. Another pretty much equivalent way is to use B_i as a cost function and solve max B_i st Ax <= b for each i and see if the solution violates B_i xsol <= d_i 6,7,8) 6pt each