June nomination into the pool should have been 500 Mcfd of production gas
(from Phillips) and 7,500 Dth of pool gas from Power Gas Marketing.  You
should check with Heidi Boyd @ CES for the actual noms into the pool.  She
should have nominated these volumnes into CES's pool since ENA does not have
a pool.
As far as I know, the pool to pool transfer fee is $0.04/Dth or $100.00 which
ever is LESS.  Therefore,  for volumes over 2,500 the transfer fee should be
$100.00 no matter what the volume is.

Phillips' contract for 500 MCFD metered production  goes through NOVEMBER
(this volume may be less because of high line pressures).
Power Gas Marketing's contract for 7,500 Dth /Month pool to pool goes through
OCTOBER.

If Clinton is interested in the volumes through contract expiration, I can
ask Phillips to grant us permission to move the meters into Clinton's pool.