Date: Thu, 29 Jun 2000 23:45:00 -0700 (PDT)
From: john.singer@enron.com
To: chris.germany@enron.com
Subject: Re: EOG for July, Peoples
Cc: hboyd@columbiaenergygroup.com
Bcc: hboyd@columbiaenergygroup.com

Since we have meters (Phillips Production meters) in the pool, if PNG will
allow, it may be best to transfer the pool to ENA's name.  If the CES pool
has to be closed, Phillips Production will have to sign documents to move
meters from pool to pool.  I'm not sure what the lead time is to move meters.


If you are going to nom 430 Dth/Day, Heidi needs to nom Phillips Production @
9,058 Mcf/Month (9,058 * 1.03 = 9,330 dth) plus Power Gas 4,000 Dth/month.

Is Clinton going to take the PNG throug the end of the contracts?  Power Gas
expires 10/31, Phillips expires 11/30.