
Date: Tue, 21 Mar 2000 01:32:00 -0800 (PST)
From: charlotte.hawkins@enron.com
To: lauri.allen@enron.com
Subject: Re: PG&E Texoma Volumes
Cc: robert.lloyd@enron.com, tom.acton@enron.com, daren.farmer@enron.com,
pat.clynes@enron.com, bryan.hull@enron.com, gary.hanks@enron.com
Bcc: robert.lloyd@enron.com, tom.acton@enron.com, daren.farmer@enron.com,
pat.clynes@enron.com, bryan.hull@enron.com, gary.hanks@enron.com

Daren and Lauri:

We do have a problem with some of our mirrored meters.  When MIPS receives an
"incomplete" from the parent meter it sends a -0- to POPS.  Yes, this is a
big problem.  Our POPS team (Romeo D'Souza) has identified this problem and
notified MIPS.  However, he was told this was not a priority item.   In the
mean time we are overriding the volumes in POPS with the estimated volumes.

This particular meter was correct last night, the 14th rolled last night from
MIPS and overrode the BAV with a -0- from day 14 forward.

This was corrected this morning and the meter re-allocated.

Thanks,

Charlotte





