| Date | Category | Details | Time Spent |
| Fri, Apr 28 | Administrative Tasks | worked on slides, fixed some small code issues, worked on demo, read kiva | 3:00 | |
| Mon, Apr 24 | Class | Class
and Coding. Worked on integrating transportation demo material and code
base. Had some problems with thread safe calls and code that was not
type checked properly | 3:00 | |
| Sat, Apr 22 | Coding | Worked on integrating ETA and Database class with shuttle input handler and the backend Java classes | 10:00 | |
| Fri, Apr 21 | Coding | Continued work on ETA module, Database access and capacity functions | 8:00 | |
| Thu, Apr 20 | Coding | Worked on ETA function, integrating shuttle handler, backend C++ database connector, route and bus object representations | 9:00 | |
| Sat, Apr 8 | Coding | Worked on MySQL database
Migrated data into database
worked on coding ETA Function | 6:00 | |
| Thu, Apr 6 | Group Meeting | Discussed SQL tables and indivudal work progress for the next week | 2:00 | |
| Thu, Apr 6 | Research | Wrote pesudo-code for ETA function | 4:00 | |
| Tue, Apr 4 | Administrative Tasks | read kiva(this covers several days) | 3:00 | |
| Mon, Apr 3 | Class | Met in class to go over cross-group roles and updated tasks for the next week in order to kick start the implementation process | 1:00 | |
| Fri, Mar 31 | Group Meeting | Leaders meeting | 1:00 | |
| Wed, Mar 29 | Administrative Tasks | Researched
all design documents and the wrote my section of the Phase 2 report. My
section detailed the server software and architecture for the
transportation group | 3:00 | |
| Thu, Mar 23 | Administrative Tasks | Did my portion of slides for presentation. ETA and Sever setup and software | 1:00 | |
| Wed, Mar 22 | Group Meeting | Went over results of Egg drop. Worked on finishing UI design and features, also worked on slides for Transporation Phase 2 | 4:00 | |
| Mon, Mar 20 | Administrative Tasks | Set up Trinetra Server. Installed OS, MySQL, Tomcat, and put the computer on the ECE network. | 6:00 | |
| Mon, Mar 20 | Class | Egg drop | 2:00 | |
| Wed, Mar 15 | Group Meeting | Worked on detailed Design of ETA and User Interface | 3:00 | |
| Mon, Mar 6 | Administrative Tasks | Reading Kiva | 2:00 | |
| Mon, Mar 6 | Architecture Design | Worked
on detailed design of server component. Worked on interface between
user/server, server/bus, ETA/Sechedular/Position/Notifications/Admin
within the server sub-component. (some of this was over the weekend) | 6:00 | |
| Mon, Mar 6 | Architecture Design | In
class detailed system design. The API between the shuttle and server,
server and user, and server components was drilled down and agreed on.
I primarily focused on the user-server API and the server-components API | 2:00 | |
| Thu, Mar 2 | Group Meeting | Discussed Detailed design. Broke into sub-groups in order to work on sub-components. | 2:00 | |
| Wed, Mar 1 | Class | Worked on detailed design and sub-component break down | 2:00 | |
| Mon, Feb 27 | Field Testing | Read Kiva and rode the bus to test cell phone and GPS reception. | 1:30 | |
| Tue, Feb 21 | Research | Researched specific device capabilities for Phase 2 purchases | 6:00 | |
| Tue, Feb 21 | Group Meeting | Discussed
procurment and speific devices we may need. I particlularly looked into
the comuting device for the bus and presented serveral options,
including IPAQ, Asus MyPal with GPS, and a thin and light Laptop. | 2:00 | |
| Mon, Feb 20 | Administrative Tasks | Recording and summarized notes from Fridays meeting | 2:00 | |
| Mon, Feb 20 | Class | Discussed Dependency graph in class | 2:00 | |
| Fri, Feb 17 | Group Meeting | Go over next tasks | 2:00 | |
| Thu, Feb 16 | Writing Reports / Presentations | Worked on my portion of the Transportation group writeup for Phase 1. | 4:30 | |
| Mon, Feb 13 | Class | Presented to the class the phase 1 accomplishments | 1:30 | |
| Fri, Feb 10 | Group Meeting | Presenter's meeting to go over slides | 2:00 | |
| Thu, Feb 9 | Administrative Tasks | Worked on presentation for class on Monday the 13th | 2:00 | |
| Thu, Feb 9 | Administrative Tasks | worked on presentation for Intel Seatle labs(Trinetra related) | 1:00 | |
| Wed, Feb 8 | Class | Discussed Architectures and Combined Architectures | 1:30 | |
| Tue, Feb 7 | Architecture Design | Group met to finalize the architecture that is to be presented in class on the 8th | 2:00 | |
| Thu, Feb 2 | Architecture Design | Met to discuss architecture design to meet functional requirments for 4 design areas. | 1:30 | |
| Wed, Feb 1 | Group Meeting | Went over presentation for class on Feb 1. | 1:00 | |
| Wed, Feb 1 | Class | I presented the transporation groups product and technology matrix to the other groups | 2:30 | |
| Tue, Jan 31 | Research | Looked
into possible technologies for the escort to human notification. In
particular how does the shuttle know a visually imparied person wants
to get on the bus.
Technologies investigated
Blue Tooth
Zigbee
UltraWideBand
GPS/Cell Phone
802.11 Family
and using some phsycial senors at the stop. My document summary is
attached | 2:00 | |
| Tue, Jan 31 | Group Meeting | Discussed
various products and possible solutions for the Transportation group.
In particular, I presented possible solutions for escort to human
interaction | 1:30 | |
Time spent:Total: 121:30
Administrative Tasks: 23:00 Architecture Design: 11:30 Class: 15:30 Coding: 33:00 Field Testing: 1:30 Group Meeting: 20:30 Research: 12:00 Writing Reports / Presentations: 4:30 |