DateCategoryDetailsTime Spent
Wed, May 10Writing Reports / PresentationsFinished up writing for the phaseIII presentation. So much information to cram in a small space.2:00
Wed, May 10Writing Reports / PresentationsStarted graduate credit report. reflections paper on the course long semester.2:00
Tue, May 9Writing Reports / PresentationsMade a first cut at my writing sections for the Phase-III presentation. Almost done woo-hooo!4:00
Wed, May 3Codingwatched the more groups presentation. good stuff, they blew the trinetra presenters away.1:20
Mon, May 1Classdemo! woo hoo. too bad it didnt' go a little better. the presentation seemed long and floundered a bit, and the transportation demo was off key. 1:20
Mon, May 1Group Meetingpreperation for the demos in class. got everything set up and running. 2:00
Thu, Apr 27CodingFinalized and froze code base for Mondays presentation. All parts are in place.6:00
Thu, Apr 27Group MeetingDemo Dry Run. OCR didn't show, big surprise.1:00
Wed, Apr 26Classairplane comp!... omg fun and scary that we won. don't sniff glue =P1:30
Wed, Apr 26Codingfinished integration. capacity, user display, eta, both notifications complete. looks good. need to tie up loose ends before demo at 4:30pm.8:30
Tue, Apr 25Codingfuther work with the eta/notification/server-client code. getting closer. gave chris sample datasets and a small tcp client/server program to build the graphics on top.6:00
Mon, Apr 24Classclass, talked about demo, got update from transportation group, broke off to the cic to work on integration1:20
Sun, Apr 23CodingIntegration meeting and coding session. 11am - 6:30pm 9:30pm - 12:15pm. i'm leading the bulk of the C++ integration work. Its a real pain.10:15
Fri, Apr 21Codingshuttle client/server. Finished WAV announcements per stop. setup the demo scenario, unit tested with perstop data. Looks Good!4:00
Wed, Apr 19Classreview and discuss the project direction and action items. everything seems on track for saturdays integration meeting.1:30
Wed, Apr 19Administrative Taskshad to track down phones for billing purposes. someone in our midst is a cheat and tried to jack the phones billing information. sigh.0:30
Mon, Apr 17Classshowed jovan and joe code segments of the shuttle input handler.1:00
Mon, Apr 17Codingfinished client side application protocol. need to finish garmin api and now some type of demo functionality for dan.6:00
Thu, Apr 13CodingFinished application protocol, and server side implementation is done. need to finish data classes for handling client inputs on the shuttle input handler. need to finish client side implementation of application protocol.2:30
Wed, Apr 12CodingWorked on application protocol from shuttle clients to the shuttle input handler. almost finished.2:00
Wed, Apr 12Classmet with transportation group to talk about implementation progress and how our respective interfaces hook-up.1:20
Tue, Apr 11Codingstarted working on the shuttle input handler and server applications today. made good progress, finished all of the networking code (i.e. heavily concurrent multiplexed i/o server with priority based batch processing for inputs) this is turning out to be some meaty code. 8:00
Mon, Apr 10Classreceived grades for phaseII. worked with group to review implementation progress.1:20
Thu, Apr 6Preparing Specsrewrote part of the system design so we can proceed with implementation.3:00
Thu, Apr 6Group Meeting430-530. more handholding. hopefully we'll start implementation soon.1:00
Wed, Apr 5Classclass. argued more about implementation details. having troubles solidifying the final BL and sql tables that drive the application.1:30
Mon, Apr 3Writing Reports / Presentationsmore work with phase-II document. almost finished4:00
Mon, Apr 3Classclass. talked about report, and planning for implementation.1:20
Mon, Apr 3Writing Reports / Presentationsfinished report. added jovans section.0:30
Sun, Apr 2Writing Reports / Presentationssecond meeting with phase-II editors. compiled results and worked on report. long meeting.6:00
Thu, Mar 30Group Meetingfirst meeting with phase-II editors. assigned action items and outlined report.1:00
Thu, Mar 30Writing Reports / PresentationsPrepared template for written report.1:00
Wed, Mar 29Classaircrafts presentation.1:20
Wed, Mar 29Administrative Taskskiva updates and meeting planning.0:30
Wed, Mar 29Writing Reports / Presentationsfirst pass at transportation written report, and yes this is pretty tedious.3:30
Tue, Mar 28Administrative TasksMore corridination for Phase-II written report. See kiva posts.1:00
Mon, Mar 27Writing Reports / PresentationsCreated phase-II report outline for transportation. Issued writting assignments to my subgroup. Kiva catchup. 1:00
Thu, Mar 23Group Meetingmore presentation work. compiled slides and started BL sections to bring middle tier server together.2:00
Thu, Mar 23Writing Reports / Presentationsdesigned overall software architecture and server software architure slides.3:00
Thu, Mar 23Administrative Taskskiva catchup and worklog monitoring.0:15
Wed, Mar 22ClassEgg Drop review session and design discussion. Assigned ownership to presentation pieces and discussed layout of slideware. Merged into a longer group meeting.3:00
Wed, Mar 22Administrative Taskskiva update. posted photos and d/l slideware to finish for tomorrows 7pm meeting.0:30
Tue, Mar 21Administrative TasksPlanning for next two weeks of class and kiva catch up.1:00
Mon, Mar 20ClassEgg Drop. We made a cone with built in egg-eject functionality1:30
Mon, Mar 13Data Migration & RestorationNot sure what the "Data Migration & Restoration" category means, maybe some type of art thing? Today I spent 9 hours! creating the static shuttle schedules for the transportation group, this includes stops, waypoints, and intersections and thier distance and bearing information between data points. Consider these static shuttle schedules final and not for review =P.9:00
Fri, Mar 10Administrative Taskskiva review and posted pictures of previous meetings0:30
Wed, Mar 8Classoverview of smart notes. further break down of transportation group in whiteboard session1:20
Wed, Mar 8Group Meetingwhiteboard session. reviewed architecture started on object model across system. new action items and reallocation of human resources into slow moving undermaned areas.1:00
Mon, Mar 6Administrative Tasksread kiva. update kiva. with detailed design notes and product procurement tasks.1:00
Mon, Mar 6Classreviewed progress of subteams in detailed design. simplified design areas, consolidated interfaces to tie together sub-components, and repurposed human resources.1:20
Mon, Mar 6Group Meetingreviewed progress of subteams in detailed design. simplified design areas, consolidated interfaces to tie together sub-components, and repurposed human resources. continuation of class design meeting. we ran over.1:00
Thu, Mar 2Group Meetingreviewed two person subteams and high level objectives moving forward. I broke out with Chris to address Software and protocols on shuttle1:00
Wed, Mar 1Classdrilled down on task assignment and ownership. broke into two person subteams for partial product ownership.1:20
Tue, Feb 28Researchpriced and purchased shuttle hardware. garmin 18, xtrasys gprs pcmcia card, 2 port 120v power inverter.2:30
Mon, Feb 27Classgroup meeting. and shuttle ride. tested signal strength for mobile carriers and handheld gps receiver1:30
Thu, Feb 23Group Meetingfinalized purchasing decisions. moving forward with buying items for project.0:45
Wed, Feb 22Classstudent grades. updated transportation groups task dependency timeline and revamped task assignments .1:30
Tue, Feb 21Group Meeting2hrs! addressed procurement concerns for the shuttle. ironed out interaction models and assumptions for: driver to shuttle-device, shuttle-device to driver, shuttle-device to user, user to server. Also we listed assumptions about the interaction models that will drive future detailed design discussions. 2:00
Mon, Feb 20Writing Reports / Presentationsgrrr. rewrote the transportation task dependecy graph to meet the "formatting" of the shopping group. waste of time.0:30
Mon, Feb 20Classtask depend graph. ect.1:40
Sun, Feb 19Writing Reports / Presentationsfinished (i) transportation project planning and phase-I review, (ii) worklog summaries for all of Trinetra, and (iii) crisis mitigation for navigation subgroups written report5:00
Wed, Feb 15Classclass. phaseI presentations. air maintenence group.1:20
Wed, Feb 15Group Meetingdiscuss and assign writting topics0:10
Wed, Feb 15Administrative Taskskiva catchup0:15
Tue, Feb 14Administrative Taskskiva catchup. writing breakdown.1:00
Mon, Feb 13Writing Reports / Presentationsreview phase-I presentation0:30
Mon, Feb 13Administrative TasksKIVA catchup0:30
Mon, Feb 13Working with clientMeet with Priya and SGT RICCI. 10:30am to talk about campus shuttle service and how we can work with them. Present Joe T, Drew W, Priya N, Aaron P, SGT RICCI.0:30
Mon, Feb 13Classclass. phaseI presentations. good job guys.1:20
Mon, Feb 13Working with clientMeet with Priya and SGT SOBAL. 6pm. Present Joe T, Pat L, Priya N, Aaron P, SGT SOBAL. SOBAL is the maintenence guy, knows a lot about inner workings of shuttle/escort service.1:00
Fri, Feb 10Administrative Taskssynch up with group and project emails/kiva.0:30
Fri, Feb 10Staff / Leaders Meetingleaders meeting. discussed finalizing Phase-I and individual subgroup reports.1:00
Wed, Feb 8Architecture DesignSoftware block diagram.1:30
Wed, Feb 8Writing Reports / Presentationseditor work and finalized software diagram for architecture presentation.1:00
Tue, Feb 7Group MeetingArchitecture planning and work delegation. We need to start working on "meeting" efficiency at these events.1:30
Fri, Feb 3Staff / Leaders Meetingplanning and over for next two weeks. week in review.1:00
Thu, Feb 2Group Meetingfirst architecture. planning. in attnd: dan s andrew w aaron p asim s outcome: two baseline architectures1:20
Wed, Feb 1Writing Reports / Presentationsfirst pass at PFM presentation.1:00
Wed, Feb 1Writing Reports / Presentationsfinalize PFM presentation1:00
Wed, Feb 1ClassPFM presentations1:30
Tue, Jan 31Group MeetingProduct Feature Matrix Meeting. Reviewed topics. plan to meet tomorrow 9:30 to finalize items.1:15
Tue, Jan 31ResearchR&D for localization protion of transportation sub group. pending results via email0:30
Mon, Jan 30ClassHCI rough draft visionary scenarios. Q&A.1:20
Mon, Jan 30Administrative TasksMgmt tasks. scheduled meetings, reminded group of tasks.0:30
Thu, Jan 26Staff / Leaders MeetingAttendance: Aaron Paulos, Matt Lee Location: 2225CIC Topic: Discussed (i) overall project direction from HCI standpoint and (ii) division of transportation group into two groups1:00
Thu, Jan 26Group Meeting4:30-6PM. Full group meeting. split group into two sections, each is researching two topics. shorter meeting with transportation only group, new group is joe javon drew and ap.1:30
Wed, Jan 25Group Meetingfirst full group trinetra meeting, and sub group break away.0:30
Wed, Jan 25Administrative Taskstransporation group division and planning for first trasnportation group meeting.1:00
Wed, Jan 25Classintro to kiva and project development cycles1:00
Mon, Jan 23Group Meetingformed subgroups1:00
Mon, Jan 23Classtrinetra and dick martin's introductions1:20
Wed, Jan 18Classfirst class1:20

Time spent:
Total: 176:25


Administrative Tasks: 9:00
Architecture Design: 1:30

Class: 35:50
Coding: 54:35

Data Migration & Restoration: 9:00
Group Meeting: 20:00

Preparing Specs: 3:00
Research: 3:00

Staff / Leaders Meeting: 3:00
Working with client: 1:30

Writing Reports / Presentations: 36:00