@use(database="/../wyvern/usr/sfinger/scribe") @device(postscript) @style(Fontfamily ,fontscale=10, spacing 1.2, spread 0.5, indent 0) @define(printcomment=text, size -1, leftmargin .5in, facecode I, spacing 1, above 1, below 1) @modify(itemize, above 0.5, spread 0.2, spacing 1, rightmargin -0in) @DefineFont(SpecialFont, Q=) @Define(EmDash, Font SpecialFont, FaceCode Q, AfterEntry ) @DefineFont(FormFont, A=, I=, B=, R=, P=, T=,) @define(formtext, font FormFont, size 8) @make(article) @style(timestamp="Saturday, March 8, 1952: 4:30 p.m.") @use(bibliography "rapid.bib") @style(references=alphabetic) @modify(Figurecounter, within unnumbered) @modify(Tablecounter, within unnumbered) @modify(description, leftmargin 1 in, indent -1 in) @Modify{hdx, above 0} @pageheading() @disable(contents, figurecontents, tablecontents) @begin(comment) @device(file) @style(Fontfamily , linewidth 7in, justification off, indent 0) @define(printcomment=text, leftmargin 1in, above 1, below 1) @modify(itemize, above 1, below 1) @define(emdash, afterentry <-->) @end(comment) @set(page=0) @pagefooting(immediate, center "A-@value(page)") @include(project.summary) @set(page=0) @pagefooting(center "B-@value(page)") @newpage @include(table.contents) @set(page=0) @pagefooting(center "C-@value(page)") @newpage @include(main.body) @include(prior.results) @set(page=0) @pagefooting(center "D-@value(page)") @newpage @begin(text, size 14) @b{D. Bibliography} @end(text) @begin(text, size 10, justification off) @bibliography @end(text) @set(page=0) @pagefooting(center "E-@value(page)") @newpage @include(bio.sketches) @begin(comment) @set(page=0) @pagefooting(center "F-@value(page)") @newpage @begin(text, size 14) @b{F. Summary Proposal Budget and Budget Justification} The equipment requested in Year 1 is an Silicon Graphics Indigo 2 extreme with 32Mb memory and 1Gb disk. This is the standard "mid-range" graphics work station for the simulation lab. The workstation will help to offset the additional load on the facility that will be generated by the proposed work. The equipment requested in Year 2 is to upgrade the computer and video hardware that controls and monitors the Shape Deposition process. This equipment will include an low-end Silicon Graphics workstation and video interface board. The existing controller is an old Sun 360 which is slow and is difficult to integrate with other machines on the proposed network. @set(page=0) @pagefooting(center "G-@value(page)") @newpage @begin(text, size 14) @b{G. Current and Pending Support} @end(text) @end(comment) @set(page=0) @pagefooting(center "H-@value(page)") @newpage @include(facilities) @set(page=0) @pagefooting(center "I-@value(page)") @newpage @begin(text, size 14) @b{I. Letters of Support from Industrial Collaborators} @end(text)